Industry 02 · Courier · Express · Parcels · 24/7

Raw volume.
Cut-off windows that don't forgive.

The CEP industry runs on the clock. Parcels in, sorted, out — in tight cycles tied to the last truck on the route. No other sector demands as much uptime from the system as courier.

Typical operation profile
Parcels/day50,000 – 500,000
Hub throughput (peak)10,000 – 25,000/h
Operation24/7 · 365
Route cut-off±15 min
Required uptime99.5%+

Typical CEP pain points

What hurts courier hubs.

Five recurring complaints we hear from CEP operators in Romania and the region.

Missed cut-off = lost client

The last truck on the route leaves at a fixed time. Any parcel that doesn't reach sorting in time = SLA missed, contractual penalties, unhappy client.

Mixed volumes: envelopes → parcels

From 50g envelopes to 30kg parcels. The system must be gentle with fragile items and robust for weights.

24/7 with no maintenance windows

The hub never stops. Maintenance happens by sub-zone, without shutting down the whole flow.

Brutal seasonality

December + Black Friday double the volume. The system must hold 200% peak with no degradation.

Sorting to hundreds of destinations

Postal codes, secondary hubs, last-mile partners. Manual sorting is no longer feasible above 5,000 parcels/hour.

Per-parcel traceability

Scan at every point, timestamp, route tracked. Data flows live into the tracking system.

Typical flow in a CEP hub

Truck to truck. In 90 minutes.

This is what a modern CEP cross-dock automated by ZEDlog looks like. Volume flows without pauses between the five stations.

01
Truck unloading

Parcels onto telescopic conveyors, direct entry to HPP.

HPP · MCP
02
Induction & scanning

6-side reading, dimensions, weight, destination assignment.

HPP · WCS
03
Crossbelt sorting

MX-H splits parcels to hundreds of destinations, up to 12,000/h.

MX-H sorter
04
Per-destination accumulation

Short buffer before loading. Auto-generated manifest.

HPP · WCS
05
Truck loading

Telescopic belt by route. Departure on time, cut-off held.

HPP

Typical post-implementation results

Numbers that matter in CEP.

Figures from projects we've completed. Variation depends on starting state and profile — we discuss your layout during evaluation.

12k
parcels/hour at MX-H sorter
99.7%
sorting accuracy
−70%
labor force at sorting
99.5%+
uptime 24/7 operation

Portfolio reference

National CEP operator · Romania · 2023.

Regional hub director

"Before, we missed 3–4% of cut-offs in December. With the automated sorter and HPP, last year we were at 0.2% — and that was from incoming truck delays, not from inside."

Anonymized at client request · Confirmation available for 1:1 meetings
2.4×
sorting throughput per day
−92%
missed cut-offs
14
months from start to go-live
21
months realized payback

Hold any cut-off. Whatever the volume.

Send us your hub layout + day/night volumes + number of destinations — we propose a stack and estimate capacity within 10 working days.